Thursday, March 17, 2011

Knitting: sweater point ajour

Today we will give you all the explanations to make a sweater with a collar point ajour up the coast. The required size of this knitting is a 42/44. Materials needed: 550 grams of yarn color you prefer, knitting needles No. 8 No. 8 and a game. Ajour point: on a number of links divisible by 18 + 1 + 2 mesh selvage.

Work following the diagram. Lists only the knife forward. In irons return to work the stitches as they present themselves and thrown upside down. Start with a selvage mesh and the mesh prior to the report, repeating the report, complete with links that follow the report and a knitted selvage.

Always repeat from 1 to 28 ° row. Place ribs A: 1 selvage mesh, mesh rov * 1., 2 mesh dir., 1 mesh rov. *, Repeating from * to *, 1 mesh selvage. In irons return to work the stitches as they appear. Place ribs in B round: * knit 1 rov., 2 mesh dir. *, Repeat from * to *. Made with the samples before starting work to develop ajour 12 stitches, 18 rows and coastal point to 13.5 and 18.5 iron mesh, corresponding to portions of 10 × 10 cm square.

Rear: 57 jerseys and start working up ajour. A total height of 51 cm, for the neck, twist the central links 13 and end the two parties separately, weaving from side neck once every 2 rows 1 6 1 x 4 mesh and mesh. A total height of 54 cm fold the remaining 12 stitches on each shoulder. Front: as an indicator for the back, but with the neck deeper.

A total height of 47.5 cm, for the neck, twist the 7 central links and end the two parties separately, weaving from side neck every 2 rows 1 time 5 shirts, 1 x 3 mesh, mesh 2 times 2 1 time and 1 mesh. Sleeves: 38 jerseys and start work at short point A. A 26 cm high at the sides a total increase once a mesh, then every 6 rows 2 times a jersey and every 4 rows 4 times a mesh point as required.

A 43 cm total height of all weave mesh. Packaging: close behind. For the neck, with the game of irons, resume by 93 mesh neckline and stitched ribbed B. A 3 cm from the beginning of the neck increase by a twisted wire mesh backhand cross every 2 stalks upside down. After 3 1 cm increase from the wire mesh in reverse twist cross in each of the remaining coastline.

Working to increase the mesh back. A 18 cm from the beginning of the neck weave all links as they appear. Seal the sides and the sleeve. The sleeves.

No comments:

Post a Comment